Performance Analysis of Optimal PV Placement and Loss Analysis in Power Distribution Network
Implementation plan:
—————————
Scenario 1: (PV at Bus7)
—————————–
Step 1: Initially, we Construct the power distribution network in Simulink Using buses and PV
Step 2: Then, we simulate and collect PV power data at PV as Bus7.
Step 3: Next, we detect power flow and calculate voltage, active, and reactive losses PV placement.
Step 4: Next, we Integrate control logic to compute PV based load demand and irradiance.
Step 5: Finally, we plot performance metrics for the following
5.1: Time vs. Current (A)
5.2: Time vs. Voltage (V)
5.3: Time vs. Power (KW)
Scenario 2: (PV at Bus7 & Bus 2)
————————————–
Step 1: Initially, we Construct the power distribution network in Simulink Using buses and PV
Step 2: Then, we simulate and collect PV power data at PV as Bus7 and Bus 2.
Step 3: Next, we detect power flow and calculate voltage, active, and reactive losses PV placement.
Step 4: Next, we Integrate control logic to compute PV based load demand and irradiance.
Step 5: Finally, we plot performance metrics for the following
5.1: Time vs. Current (A)
5.2: Time vs. Voltage (V)
5.3: Time vs. Power (KW)
Scenario 3: (PV at Bus7 , Bus 2 and Bus 5)
————————————————-
Step 1: Initially, we Construct the power distribution network in Simulink Using buses and PV
Step 2: Then, we simulate and collect PV power data at PV as Bus7 , Bus 2 and Bus 5.
Step 3: Next, we detect power flow and calculate voltage, active, and reactive losses PV placement.
Step 4: Next, we Integrate control logic to compute PV based load demand and irradiance.
Step 5: Finally, we plot performance metrics for the following
5.1: Time vs. Current (A)
5.2: Time vs. Voltage (V)
5.3: Time vs. Power (KW)
Software Requirements:
—————————–
1. Development Tool: MATLAB 2023a/Simulink or above
2. Operating System: Windows 10 (64-bit) or above
Note:
——
1) If the plan does not meet your requirements, provide detailed steps, parameters, models, or expected results in advance. Once implemented, changes won’t be possible without prior input; otherwise, we’ll proceed as per our implementation plan.
2) If the plan satisfies your requirement, Please confirm with us.
3) Project based on Simulation only, not a real time project.
4) Please understand that any modifications made to the confirmed implementation plan will not be made after the project development.